Welcome to India Renewable Energy News | Contact: +91 9220337640



Follow India Renewable Energy News on WhatsApp for exclusive updates on clean energy news and insights

Lebanon’s First 1MWp Solar Installation Successfully Completed

In a significant milestone for renewable energy in Lebanon, a 1MWp solar installation has been successfully completed in partnership with KBE INTERNATIONAL and KBE Energy Store. The project was executed by EPC contractor MEDCO SAL, with Robert Balech as the Project Manager.

Lebanon has long struggled with high fuel consumption and rising energy costs due to its dependence on diesel generators. This project was designed to tackle these challenges by integrating Solis inverters, which help reduce fuel usage and optimize generator operations. By lowering the number of diesel gensets required and improving load management, the solution enhances both cost savings and energy efficiency.

Project Highlights
  • Capacity: 1MWp
  • System Configuration: 4x500 + 1x700 KVA
  • Inverters Used: 9 x S5 110KW Solis Inverters

The deployment of this system marks a crucial step toward sustainable energy solutions in Lebanon. With reduced reliance on diesel, businesses can significantly cut down on fuel expenses and lower their carbon footprint.